TOPCRET – CLAY
How clay plaster is applied: the Clay® process, step by step
Search for how to apply clay plaster and you'll find recipes for mixing your own, and plenty of warnings that coats that go on too thick will crack. Clay® works differently: it is a pre-mixed system, applied in thin coats by an applicator Topcret has trained, and backed by a written guarantee.
This page walks you through what happens on your project, from the first site visit to the day you can hang a picture, so you know what to expect and what to prepare.
In short: Clay® is applied in four stages: the substrate is checked, repaired and primed; a base coat goes on with a steel trowel and dries for 4–6 hours; a second coat creates the texture; and the wall dries for 24 hours. A typical room takes about two days.
Request a quote
- Typical timeline: about 2 days (base coat one day, finish the next)
- Base coat drying: usually 4–6 hours
- Final drying: 24 hours
- Systems: Clay® Wall (dry rooms) and Clay® Hydro+ (bathrooms, kitchens, showers)
- Substrates: drywall, cement board, lime plaster; over paint after preparation
- Who applies it: certified applicators trained by Topcret
Two systems, chosen before anything is mixed
Clay® Wall is for dry interiors: living rooms, bedrooms, hallways, offices, hotel rooms. It keeps the breathable, matte character of clay.
Clay® Hydro+ is formulated for wet and humid areas: bathrooms, kitchens, showers, spas. Its base coat includes water-resistant components, so the same look can run from a dry wall into a shower, where it goes over a waterproofing membrane and is sealed.
Many projects use both: Wall in the bedroom, Hydro+ in the en-suite bathroom, in the same color and texture.
Step 0: the site visit
A technician visits the project, looks at every surface to be coated and recommends the system, the texture and the preparation each wall needs. That visit is also when the quote is fixed, so what was agreed is what gets done.
Step 1: checking and priming the substrate
Clay® goes over most interior substrates, as long as they are:
- Stable: no active cracks, no movement, no loose plaster
- Clean and dust-free: no grease, soap film or peeling paint
- Compatible: drywall, cement board, lime plaster; painted walls after preparation. For any other surface, ask your applicator first
On drywall, seams and nail pops are finished first. A primer suited to the substrate is then applied: it helps the clay grip and evens out how fast each part of the wall absorbs water, which is what prevents blotchy drying later.
Step 2: the base coat
The applicator spreads the first coat with a steel trowel, in a thin, even layer. In the Hydro+ system, this is the coat that carries the water-resistant components. It dries for 4 to 6 hours, depending on temperature, humidity and ventilation.
Step 3: the texture and finishing coat
The second coat defines the look. Circular or linear trowel strokes, and how the surface is closed, produce the texture, from flat and velvety to a bold, rustic relief.
Which one fits your room is covered in clay wall finishes.
Step 4: drying and sealing
The finished wall dries for 24 hours. Sealing is optional with the Wall system and recommended where hands and splashes are frequent, such as around a light switch, behind a kitchen counter or in a hallway. In a shower, Hydro+ is always sealed.
What you prepare, and what the applicator does
| You | Your applicator |
|---|---|
| Clear the room or the wall and remove wall plates and hardware you want to keep | Protects floors, windows and fixtures with masking and sheeting |
| Make sure heating or air conditioning can keep the room at a normal temperature | Repairs and primes the substrate |
| Plan for ventilation and keep the room closed to traffic for the two days | Applies base and finishing coats and checks drying between them |
| Choose color and texture with your applicator | Inspects the finished surface with you at the end |
Common mistakes, and why a system avoids them
Most problems with clay walls come from four shortcuts:
- Skipping the primer: the clay doesn't grip evenly and can lift.
- Coats that are too thick: thick clay shrinks as it dries and cracks.
- Rushing the drying time: the finish dries patchy and the color looks uneven.
- The wrong trowel: the texture comes out different from the sample.
A pre-mixed system, a trained applicator and a test patch on your own wall take care of all four.
Can you apply clay plaster yourself?
Traditional clay plaster is a popular DIY project, and on a small accent wall a careful beginner can get a good result. Clay® is a professional system: installation through certified applicators is what Topcret's 3-year written guarantee depends on, and it matters most in bathrooms and showers, where preparation decides how the wall performs. If you are a contractor and want to offer Clay®, see Topcret licensed partners: Clay® is applied through the same network of applicators as Topcret microcement.
Looking after a Clay® wall
- Dust it or wipe it with a damp cloth.
- Avoid bleach, solvents and abrasive cleaners.
- Small scratches can be repaired with a local touch-up coat.
- Over time, Clay® develops a soft natural patina.
FAQs
How long does it take to apply clay plaster?
For a typical room, about two days: preparation and the base coat on the first day, the finishing coat on the second, then 24 hours to dry.
Does clay plaster need a primer?
Yes. A primer matched to the substrate helps the clay grip and stops it drying unevenly. On drywall it is essential.
Can clay plaster go over paint?
Yes, once the surface is sound, clean and properly primed. Peeling paint is removed first. For other surfaces, ask your applicator.
Do I need to seal clay plaster?
With Clay® Wall, sealing is optional and recommended in high-touch areas. In a shower, Clay® Hydro+ goes over a waterproofing membrane and is sealed.
Can I apply Clay® myself?
Clay® is installed by certified applicators, which is what the written guarantee covers. For a small decorative project, traditional clay plaster kits exist, but they are a different product.
Request a quote
Tell us about your project
A few quick questions and we will get back to you with a tailored proposal.
Email or call us
The quote form needs JavaScript. You can also contact us directly:
A rough figure is fine.
Optional
Where are you based?
Your handle or a link to the profile.
Your contact details
Last step: we will email or call you with our answer.
Please wait a moment…
Preview: the HubSpot form is embedded here. No data is sent in this demo.
We could not load the last step
Email or call us and we will get back to you all the same:
Thank you for your interest
We have received your enquiry. A Topcret advisor will be in touch with you very soon.
Preview complete
This is a demo: no data was sent and nobody will receive this enquiry.
Success Stories
Real projects, real results.
What our clients say
- Topcret helped me doing a repair on my existing floor, and went the distance to get a good result. I would definitely use them againGillian D.★★★★★ (opens in a new tab)
- Jack and the team at Topcret were top-draw. We're beyond pleased with the finished look, but also very impressed with the experience. From our 1st meeting to the aftercare, Topcret were nothing but professional, knowledgable, friendly and flexible. Highly recommend.Sam S.★★★★★ (opens in a new tab)
- Topcret and Juan in particular went above and beyond. Juan worked long days to finish the project as soon as possible, and used his technical knowledge and expertise to problem-solve some of the issues we had with previous tradesmen's mistakes. So happy Topcret could match the paint colour we wanted and that the result is more of an even finish than the typical microcement mix of shades (which they can do as well - we just didn't want that look). Delighted with the result and would definitely use them again. Thank you so much!Isabel D.★★★★★ (opens in a new tab)
- We had our kitchen and bathrooms done in our house in Sydney. The team was very friendly and efficient and the end result was exactly what we wanted. Can’t recommend them enough!Carolina R.★★★★★ (opens in a new tab)
- Topcret’s attention to detail and overall quality of their work is exceptional. I am pleased with the results and would highly recommend Topcret to anyone in need of their services.Rodrigo T.★★★★★ (opens in a new tab)
- Jack has been incredibly helpful in answering all my inquiries since I’ve first visited the showroom. He also made sure that all the technical queries that were put forth from the architects were addressed and proposed solutions to better fit the material. I couldn't be happier, and would recommend 100%.Liza M.★★★★★ (opens in a new tab)
- I recently hired Topcret to finish the renovation on my kitchen and couldn’t be happier with the results. The transformation they've made is just incredible. Provided high quality work with great attention to detail. I would recommend Topcret to anyone looking to make their spaces more attractive!Francesco N.★★★★★ (opens in a new tab)
- Love the product and great customer service. I decided to go for a warm terracotta and Top Cret were very happy to accommodate to develop my own colour.Jacqui P.★★★★★ (opens in a new tab)
- Really happy with the quality of work Topcret have provided for my home. They did 2 Bathrooms, floors and walls which were finished in just 3 days. Jack was extremely helpful throughout the process, answering the many questions I had for him. Great product/ service, I will be recommending to everyone.Tommy J.★★★★★ (opens in a new tab)









