How clay plaster is applied, step by step
A clay wall is made by hand, one trowel stroke at a time. Knowing what happens on site, and in what order, helps you plan a renovation, line up your other trades and ask the right questions before you sign a quote.
This page walks through how Clay® by Topcret is applied, from checking the wall to the final coat, how long each stage takes, how Australian weather affects it, and how to look after the finished surface.
In short: a certified applicator checks and repairs the wall, primes it, trowels on a base coat, lets it dry for about 4–6 hours, then applies the finish coat that sets the texture. The wall is left 24 hours before any sealer. A typical room takes about two days. In wet areas, the waterproofing membrane comes first.
Request a quote
- Coats: primer, base coat, finish coat
- Base coat drying: usually 4–6 hours
- Before sealing: 24 hours
- Typical room: about 2 days
- Applied by: certified Topcret applicators only, with a three-year written guarantee
Two systems, two kinds of job
Before anything is mixed, the applicator picks the system for each area:
- Wall system for dry interiors: living rooms, bedrooms, hallways, offices.
- Hydro+ system for humid rooms: bathrooms, ensuites, laundries and kitchen splashbacks. In a shower recess it goes over a waterproofing membrane that complies with AS 3740, installed first by the waterproofer, and it is sealed.
A single job often uses both: Wall system in the bedroom, Hydro+ in the ensuite next door, in the same colour and texture.
Step 1: checking and preparing the wall
Clay won't fix a bad wall; it shows it. The applicator checks that the surface is:
- Stable: no movement, no loose sheets, no drummy render
- Sound and clean: free of dust, grease, flaking paint and efflorescence
- Dry: new render and set plasterboard joints fully cured
- Compatible: plasterboard, fibre cement sheet, or cement or lime render. For any other base, the applicator assesses it before quoting
Cracks are repaired, joints are reinforced, and fittings, floors and joinery are masked and covered.
Step 2: priming
A primer suited to the substrate goes on first. It evens out how much water the wall absorbs and gives the clay something to grip. On a smooth, low-absorbency surface, this step decides whether the finish will stay put.
Step 3: the base coat
The base coat is trowelled on with a steel trowel. In the Hydro+ system, this coat is the version formulated for humid rooms. It is left to dry fully, usually 4–6 hours, before the next coat.
Step 4: the finish coat and the texture
The second coat sets the texture, from smooth to rustic. The applicator works it with circular or linear strokes depending on the look. This is where the craft shows, and why two walls in the same texture never look exactly alike. More about textures in clay plaster finishes (nueva).
Step 5: drying and sealing
The wall is left for 24 hours. In the Wall system, sealing is optional and recommended where walls get touched and knocked, such as hallways. In Hydro+ it is optional too, for extra protection in heavy-use areas, except in a shower, where Hydro+ is always sealed.
Australian weather and drying
Clay dries by losing water to the air, so the weather on the day matters.
- Hot, dry or windy days (a Perth or Adelaide summer, a northerly in Melbourne) make the surface dry too fast, which can leave blotches or fine cracks. Applicators close windows, keep direct sun off the wall and work in smaller sections.
- Humid weather (Brisbane, the Gold Coast, Darwin in the wet) slows drying, so the time between coats is longer.
- Air conditioning and heaters should stay off or low on the wall being worked, to avoid drying it unevenly.
Where clay fits in a renovation
On a typical Australian renovation, the order is:
- Demolition, framing, plumbing and electrical rough-in
- Plasterboard or render, with joints set
- Waterproofing in wet areas (AS 3740), done by the waterproofer
- Clay®, by the certified applicator
- Fit-off: tapware, lights, switches, joinery, then final clean
Tell your builder early: the clay goes on after the dusty trades and before the fit-off.
Mistakes the applicator avoids
- Skipping the primer: the coat can lose adhesion
- Going on too thick in one pass: risks cracking
- Rushing the drying time: leads to blotchy colour
- The wrong trowel: changes the texture
- No test area: your applicator should show you a sample of colour and texture first
Why Topcret uses certified applicators only
Clay® is a system, not a tub of plaster: primer, base and finish coats and, where needed, sealer, matched to the substrate and the room. Topcret installs it through applicators it has trained at its academy, a technician visits the site before the quote, and the finished work is inspected and covered by a three-year written guarantee.
What to ask for in your quote
- Which system goes where (Wall or Hydro+)
- What preparation the walls need and who does it
- Colour and texture, with a sample
- Whether a sealer is included
- Timing, and how it fits with your other trades
Aftercare
- Dust or wipe with a soft, damp cloth
- No harsh chemicals, bleach or abrasive pads
- Small scratches are repaired with a local touch-up
- Over time, the surface develops a gentle patina
FAQs
How long does it take to apply clay plaster?
A typical room takes about two days: base coat on the first day, finish coat on the next. Preparation and larger jobs add time.
Do you need to seal clay plaster?
Not always. In the Wall system the sealer is optional and recommended in high-touch areas. In Hydro+ it adds protection in heavy-use areas, and in a shower it is always applied, over the waterproofing membrane.
Can I apply Clay® myself?
Topcret installs Clay® only through certified applicators; the three-year written guarantee depends on it.
Can clay plaster go over paint?
Only if the paint is well bonded; flaking paint is removed first. Any other surface is checked by the applicator before the quote.
Request a quote
Tell us about your project
A few quick questions and we will get back to you with a tailored proposal.
Email or call us
The quote form needs JavaScript. You can also contact us directly:
A rough figure is fine.
Optional
Where are you based?
Your handle or a link to the profile.
Your contact details
Last step: we will email or call you with our answer.
Please wait a moment…
Preview: the HubSpot form is embedded here. No data is sent in this demo.
We could not load the last step
Email or call us and we will get back to you all the same:
Thank you for your interest
We have received your enquiry. A Topcret advisor will be in touch with you very soon.
Preview complete
This is a demo: no data was sent and nobody will receive this enquiry.
Success Stories
Real projects, real results.
What our clients say
- Topcret helped me doing a repair on my existing floor, and went the distance to get a good result. I would definitely use them againGillian D.★★★★★ (opens in a new tab)
- Jack and the team at Topcret were top-draw. We're beyond pleased with the finished look, but also very impressed with the experience. From our 1st meeting to the aftercare, Topcret were nothing but professional, knowledgable, friendly and flexible. Highly recommend.Sam S.★★★★★ (opens in a new tab)
- Topcret and Juan in particular went above and beyond. Juan worked long days to finish the project as soon as possible, and used his technical knowledge and expertise to problem-solve some of the issues we had with previous tradesmen's mistakes. So happy Topcret could match the paint colour we wanted and that the result is more of an even finish than the typical microcement mix of shades (which they can do as well - we just didn't want that look). Delighted with the result and would definitely use them again. Thank you so much!Isabel D.★★★★★ (opens in a new tab)
- We had our kitchen and bathrooms done in our house in Sydney. The team was very friendly and efficient and the end result was exactly what we wanted. Can’t recommend them enough!Carolina R.★★★★★ (opens in a new tab)
- Topcret’s attention to detail and overall quality of their work is exceptional. I am pleased with the results and would highly recommend Topcret to anyone in need of their services.Rodrigo T.★★★★★ (opens in a new tab)
- Jack has been incredibly helpful in answering all my inquiries since I’ve first visited the showroom. He also made sure that all the technical queries that were put forth from the architects were addressed and proposed solutions to better fit the material. I couldn't be happier, and would recommend 100%.Liza M.★★★★★ (opens in a new tab)
- I recently hired Topcret to finish the renovation on my kitchen and couldn’t be happier with the results. The transformation they've made is just incredible. Provided high quality work with great attention to detail. I would recommend Topcret to anyone looking to make their spaces more attractive!Francesco N.★★★★★ (opens in a new tab)
- Love the product and great customer service. I decided to go for a warm terracotta and Top Cret were very happy to accommodate to develop my own colour.Jacqui P.★★★★★ (opens in a new tab)
- Really happy with the quality of work Topcret have provided for my home. They did 2 Bathrooms, floors and walls which were finished in just 3 days. Jack was extremely helpful throughout the process, answering the many questions I had for him. Great product/ service, I will be recommending to everyone.Tommy J.★★★★★ (opens in a new tab)